Risk Hazard Identification Using the HIRARC Method in the Construction of the KAI Boutique Hotel Cihampelas Building - Bandung

Authors

  • Bubung Burhanudin Civil Engineering Study Program, Universitas Swadaya Gunung Jati, Cirebon
  • Rifky Budiman Civil Engineering Study Program, Universitas Swadaya Gunung Jati, Cirebon
  • Muslim Rafiz Civil Engineering Study Program, Universitas Swadaya Gunung Jati, Cirebon
  • Fathur Rohman Robandi Civil Engineering Study Program, Universitas Swadaya Gunung Jati, Cirebon

DOI:

https://doi.org/10.58344/jws.v3i12.1251

Keywords:

building construction implementation, building construction risk hazard analysis, hazard risk identification, hierarchy method, k3 management analysis

Abstract

Construction projects involving heavy equipment, work at heights, and hazardous conditions are inherently high-risk, making safety management crucial. This study identifies hazards related to work accidents at the KAI Boutique Hotel Cihampelas project using the HIRARC (Hazard Identification, Risk Assessment, and Risk Control) method. The research applies a mixed-method approach, combining site observations, interviews, and questionnaires with project stakeholders. Statistical analysis and risk mapping classify risks based on severity and probability. Findings reveal 29 identified risks across ten work categories, including six high-risk items, 20 medium-risk items, and three low-risk items. The study emphasizes the need for consistent safety measures such as protective equipment, safety training, and adherence to standard procedures. The research’s novelty lies in its tailored HIRARC application in a specific construction context, offering actionable insights into mitigating occupational hazards and enhancing site safety.

References

Alfiyah, C. Q., Asih, A. Y. P., Afridah, W., & Fasya, A. H. Z. (2023a). Analisis Risiko Kecelakaan Kerja Dengan Metode Failure Mode and Effect Analysis Pada Pekerja Proyek Kontruksi: Literature Review. Jurnal Ilmu Psikologi Dan Kesehatan, 1(4), 283–290.

Alfiyah, C. Q., Asih, A. Y. P., Afridah, W., & Fasya, A. H. Z. (2023b). Analisis Risiko Kecelakaan Kerja Dengan Metode Failure Mode and Effect Analysis Pada Pekerja Proyek Kontruksi: Literature Review. Jurnal Ilmu Psikologi Dan Kesehatan (SIKONTAN), 1(4), 283–290.

Andriani, D., Ratnaningsih, A., & Putra, P. P. (2022). Analisis HIRARC Risiko K3 Fabrikasi dan Erection Gedung Baja Pembangunan Hotel Loji Kridanggo Boyolali. RekaRacana: Jurnal Teknil Sipil, 8(2), 70. https://doi.org/10.26760/rekaracana.v8i2.70

ardiyansyah, M, A. M. (2023). No ????????????????????? ?????????????????Title. 1–14.

Arsi, A. (2021). Langkah-Langkah Uji Validitas dan Realibilitas Instrumen dengan Menggunakan SPSS. Sekolah Tinggi Agama Islam (STAI) Darul Dakwah Wal-Irsyad, 1–8.

Atmaja, J., Suardi, E., Natalia, M., Mirani, Z., & Alpina, M. P. (2018). Penerapan Sistem Pengendalian Keselamatan dan Kesehatan Kerja pada Pelaksanaan Proyek Konstruksi di Kota Padang. Jurnal Ilmiah Rekayasa Sipil, 15(2), 64–76. https://doi.org/10.30630/jirs.15.2.125

Cahyo, T. A. N., & Sutarto, A. (2022). Analisis Implementasi Manajemen Risiko Pada Pembangunan Museum Dan Galeri Seni Sby*Ani Dengan Hirarc (Hazard Identification, Risk Assessment, and Risk Control). Citizen?: Jurnal Ilmiah Multidisiplin Indonesia, 2(1), 71–80. https://doi.org/10.53866/jimi.v2i1.28

Caron, J., & Markusen, J. R. (2016). ??No Title No Title No Title. Monetary Policy Report, 1(October 2021), 1–23.

Demirkesen, S. (2024). Prediction of a number of insured having work accident in the Turkish construction industry: a neural network fitting approach. Proceedings of Institution of Civil Engineers: Management, Procurement and Law. https://doi.org/10.1680/JMAPL.23.00022

Egan, R., & Caulfield, B. (2024). Disruptive, dangerous, and dirty: active travel measures as a ‘cause’ of car-related externalities. Mobilities. https://doi.org/10.1080/17450101.2024.2328213

Fandy, D., & Widiawan, K. (2022). Identifikasi Bahaya, Penilaian Risiko, dan Pengendalian Risiko Kecelakaan Kerja di PT AW Plus UPVC Bali. Dan…/Jurnal Titra, 10(2), 129–136.

Fatima, S. H., Rothmore, P., Giles, L. C., & Bi, P. (2023). Impacts of hot climatic conditions on work, health, and safety in Australia: A case study of policies in practice in the construction industry. Safety Science, 165. https://doi.org/10.1016/j.ssci.2023.106197

Janna, N. M., & Herianto. (2021). Artikel Statistik yang Benar. Jurnal Darul Dakwah Wal-Irsyad (DDI), 18210047, 1–12.

Johansen, K. W., Teizer, J., & Schultz, C. (2024). Automated rule-based safety inspection and compliance checking of temporary guardrail systems in construction. Automation in Construction, 168. https://doi.org/10.1016/j.autcon.2024.105849

Lu, Y., Qin, W., Zhou, C., & Liu, Z. (2023). Automated detection of dangerous work zone for crawler crane guided by UAV images via Swin Transformer. Automation in Construction, 147. https://doi.org/10.1016/j.autcon.2023.104744

Maulana, R., Moektiwibowo, H., & Bhirawa, W. T. (2023). Analisis Keselamatan dan Kesehatan Kerja (K3) di Apartemen The Springlake Menggunakan Metode Hirarc. Jurnal Pendidikan Dan Konseling (JPDK), 5(1), 528–539. https://doi.org/10.31004/jpdk.v5i1.10982

Mohammad, P., & Weng, Q. (2024). Comparing existing heat wave indices in identifying dangerous heat wave outdoor conditions. Nexus, 100027. https://doi.org/10.1016/j.ynexs.2024.100027

Muhammad Nur, Verly Valentino, Resy Kumala Sari, & Abdul Alimul Karim. (2023). Analisa Potensi Bahaya Kecelakaan Kerja Terhadap Pekerja Menggunakan Metode Hazard Identification, Risk Assement And Risk Control (HIRARC) Pada Perusahaan Aspal Beton. Jurnal Teknologi Dan Manajemen Industri Terapan, 2(3), 150–158. https://doi.org/10.55826/tmit.v2i3.179

Muhammad Rizki Fauzi, Layla Fitri Romadhoni, & Rois Fatoni. (2022). Analisis Potensi Risiko Bahaya Keselamatan dan Kesehatan Kerja (K3) pada Laboratorium Teknik Sipil Universitas Muhammadiyah Surakarta dengan Metode Hirarc. Simposium Nasional RAPI XX – 2021 FT UMS , 2021: Prosiding Simposium Nasional Rekayasa Aplikasi Perancangan dan Industri, 69–75.

Murtaza, I., Rashid, M. U., & Asad, M. (2024). Construction safety challenges and opportunities at design stage for building industry in Pakistan. Proceedings of Institution of Civil Engineers: Management, Procurement and Law. https://doi.org/10.1680/JMAPL.23.00010

Putri, D. N., & Lestari, F. (2023a). Analisis penyebab kecelakaan kerja pada pekerja di proyek konstruksi?: Literatur review. In Jurnal Kesehatan Masyarakat (Vol. 7, Issue 1).

Putri, D. N., & Lestari, F. (2023b). Analisis Penyebab Kecelakaan Kerja Pada Pekerja Di Proyek Konstruksi: Literature Review. Prepotif: Jurnal Kesehatan Masyarakat, 7(1), 444–460.

Sari, K. P., Chairi, M., & Helin, R. P. (2022). Analisis Risiko K3 Pada Proyek Gedung Rsud Pasaman Barat Dengan Metode Hirarc. Jurnal Rivet, 2(01), 25–31. https://doi.org/10.47233/rivet.v2i01.491

Shanti, M. Z., Cho, C. S., de Soto, B. G., Byon, Y. J., Yeun, C. Y., & Kim, T. Y. (2022). Real-time monitoring of work-at-height safety hazards in construction sites using drones and deep learning. Journal of Safety Research, 83, 364–370. https://doi.org/10.1016/j.jsr.2022.09.011

Sherratt, F., Harch, D., & Perez, A. (2024). Making zero work for construction safety in a post-zero world. Journal of Safety Research, 91, 193–200. https://doi.org/10.1016/j.jsr.2024.08.016

Sofyan, H., & Maulana, M. F. (2022). Analisis Bahaya Dan Risiko K3 Dengan Metode Hirarc Pada Area Dieshop Di Pt Xyz Plant 2. Sistemik?: Jurnal Ilmiah Nasional Bidang Ilmu Teknik, 10(1), 21–26. https://doi.org/10.53580/sistemik.v10i1.66

Son, S., Na, Y., & Han, B. (2024). Assessment of risk priorities by cause of construction safety accidents: A case study of falling accidents in South Korea. Heliyon, 10(23). https://doi.org/10.1016/j.heliyon.2024.e40303

Urbanik, P. (2024). Sharing procedural knowledge in manual work environments: Material-bodily actions as explanatory resources in construction-site interactions. Language and Communication, 99, 52–74. https://doi.org/10.1016/j.langcom.2024.08.004

Wijaya, A., Panjaitan, T. W. S., & Palit, H. C. (2015). Evaluasi Kesehatan dan Keselamatan Kerja dengan Metode HIRARC pada PT. Charoen Pokphand Indonesia/ Jurnal Titra, 3(1), 29–34.

Downloads

Published

2024-12-18

How to Cite

Burhanudin, B., Budiman, R. ., Rafiz, M., & Robandi, F. R. (2024). Risk Hazard Identification Using the HIRARC Method in the Construction of the KAI Boutique Hotel Cihampelas Building - Bandung. Journal of World Science, 3(12), 1634–1647. https://doi.org/10.58344/jws.v3i12.1251