Comparative Analysis of Material Take-Off Structure (North Building) B.Ut.2 UT.75 Based on BIM (Building Information Modeling) between Autodesk Revit and Manual Quantity Calculation in LMS-02 Range Irrigation Project

Authors

  • Taufik Rendra Mahasiswa Teknik Sipil Fakultas Teknik Universitas Swadaya Gunung Jati, Cirebon
  • Feriyanto v Mahasiswa Teknik Sipil Fakultas Teknik Universitas Swadaya Gunung Jati, Cirebon
  • Farhan Al Khaebar Mahasiswa Teknik Sipil Fakultas Teknik Universitas Swadaya Gunung Jati, Cirebon
  • Tira Roesdiana Lektor Teknik Sipil Fakultas Teknik Universitas Swadaya Gunung Jati, Cirebon

DOI:

https://doi.org/10.58344/jws.v4i5.1444

Keywords:

Autodesk Revit, Building Information Modeling (BIM), Material Take-Off (MTO), Efficiency

Abstract

The material estimation process in construction projects is a crucial step in planning and cost control. However, conventional methods such as manual calculations often take a long time and have a high potential for error. With the development of Building Information Modeling (BIM) technology, software such as Autodesk Revit offers a more efficient solution in performing Material Take-Off (MTO). This research aims to analyze the comparison of the results of the MTO calculation of the North Building structure (B.Ut.2) UT.75 in the LMS-02 Range Irrigation Project using Autodesk Revit and manual calculation methods, to find out the extent of the difference between the two methods in terms of accuracy, time efficiency, and effectiveness of their application in construction projects. The research method used is a quantitative study with a comparative approach to analyze that MTO calculations using Autodesk Revit are faster than manual methods, with a high level of accuracy in material quantification. In addition, the application of BIM in the MTO process can minimize the potential for human error and improve efficiency in project management.

References

Anggaraini, N. L. (2022). Volume comparison on structural work between calculation and Building Information Modeling. Volume 6 No 2 of 2022, 78-84.

Fachlevi, S. R. (2023). Comparative analysis of volume calculation on bill of quantity using Autodesk Revit 2022 Software with manual calculation based on SNI 2847 of 2019 at a multipurpose building in Towangan Village. Scientific Journal of Engineering and Computer Science, Vol. 2 No. 3, 150-164.

Fitriono, F. (2023). Comparative analysis of cost budget plans (RAB) conventional method with Building Information Modeling (BIM) method (Case Study of 3-Storey Building in Yogyakarta). Volume 7, Number 1, 13-24.

Ihsan, S. A. (2024). Comparative analysis of quantity take-off calculation using BIM Revit with conventional methods on the upper structure of the RSPON Building Construction Project. National Seminar on Civil Engineering at the Jakarta State Polytechnic., 336-343.

Kasuma, R. S. (2022). Volume comparison analysis between conventional methods and 3D Revit applications on Box Culvert Jobs. vol.6 No.2 of 2022, 26-33.

Kymmell, W. (2008). Building Information Modeling : Planning and managing construction projects with 4D CAD and simulations. USA: The McGraw-Hill Companies,Inc.

Laorent, D. (2019). Analyze quantity take-off using Autodesk Revit. Main Dimensions of Civil Engineering, Vol.6 No.1, 2-8.

Maghfirona, A. (2023). Comparative analysis of quantity take off structure work based on conventional methods and BIM methods case study: DW Omah Planning. Teslink Journal: Civil and Environmental Engineering, 60-67.

Mahendra, R. (2023). Comparative analysis of quantity take off (QTO) with conventional methods and the uilding information medelling (BIM) method in the construction project of the Baturaja District Attorney's Office in 2023. Teslink Journal: Civil and Environmental Engineering., 61-67.

Nies Bradley, d. E. (2008). Green BIM: Successful susntainable design with Building Information Modeling.

Saputra, I. K. (2019). Application of Building Information Modeling (BIM) in building design. e-Journal of Civil Engineering Matrix, 386.

Downloads

Published

2025-06-10

How to Cite

Rendra, T., v, F., Al Khaebar, F. ., & Roesdiana, T. . (2025). Comparative Analysis of Material Take-Off Structure (North Building) B.Ut.2 UT.75 Based on BIM (Building Information Modeling) between Autodesk Revit and Manual Quantity Calculation in LMS-02 Range Irrigation Project. Journal of World Science, 4(5), 601–611. https://doi.org/10.58344/jws.v4i5.1444