Feasibility Analysis of Station Construction Project Public Refueling (Petrol Station)

Authors

  • Joharudin Joharudin Universitas Swadaya Gunung Jati, Indonesia
  • Wildan Madhani Al Rosyid Universitas Swadaya Gunung Jati, Indonesia
  • Oki Purnama Universitas Swadaya Gunung Jati, Indonesia
  • Sulistijo Edhy Purnomo Universitas Swadaya Gunung Jati, Indonesia

DOI:

https://doi.org/10.58344/jws.v4i9.1482

Keywords:

petrol stations, project feasibility, NPV, IRR, investment

Abstract

The development of fuel infrastructure in remote areas remains a critical challenge for Indonesia's energy access equity, particularly in regions with limited petrol station coverage relative to population density and vehicle growth. This study aims to analyze the financial feasibility of the construction of petrol stations in Terjun Jaya Village, Betara District, West Tanjung Jabung Regency. The method used is a project feasibility study with a quantitative descriptive approach. The analysis includes aspects of investment costs, revenue projections, and financial indicators such as Net Present Value (NPV), Internal Rate of Return (IRR), Payback Period (PP), Break Even Point (BEP), and Profitability Index (PI). The results of the study show that this petrol station project is financially feasible with a Net Present Value of IDR 7,155,058,232, an Internal Rate of Return of 11.24%, a Payback Period of 4 years and 1 month, and a Profitability Index of 1.62%. The project shows robust market potential supported by regional vehicle population data indicating 176,435 total vehicles in the area requiring regular fuel access. The implications suggest that strategic petrol station development in underserved rural areas can achieve both financial sustainability and significant social impact by improving energy access equity while generating attractive returns for investors.

References

Afriany, J., & Sinurat, L. J. R. S. B., & Julianty, I. (2018). Penerapan MOORA untuk mendukung efektivitas keputusan manajemen dalam penentuan lokasi SPBU. JURIKOM (Jurnal Riset Komputer), 5(2).

Ahmad, H., Akbar, F., & Askur, A. (2020). Total suspended particulate and impaired lung function at operators of public fuel filling stations in Mamuju Regency. Jurnal Info Kesehatan, 18(2). https://doi.org/10.31965/infokes.vol18.iss2.304

Amalia, H., & Adi, P. (2018). Analysis of the feasibility of petrol stations with economic and social aspects in the City of Yogyakarta. Journal of Natural Resource Management, 6(1), 45–58.

Anggraini, K. N., & Ardan, M. (2024). Analisis perbandingan rencana anggaran biaya saluran irigasi metode precast dan metode konvensional. Prosiding SNAPP: Sosial Humaniora, Pertanian, Kesehatan dan Teknologi, 2(1). https://doi.org/10.24929/snapp.v2i1.3156

Baffour, R. A. (2016). Assessing the impact of fuel filling stations on the environment in Ghana. Revista Brasileira de Linguística Aplicada, 5(1).

Badan Pusat Statistik Provinsi Jambi. (2024). Statistics of motor vehicles in Jambi Province 2024. BPS Jambi Province.

Caryana, Y. K. (2022). Mathematical model on the feasibility of NGV filling station construction for public transport fuel substitution in Jabotabek area. Scientific Contributions Oil and Gas, 25(1). https://doi.org/10.29017/scog.25.1.1063

Cioara, C. R., Vlasin, N., P?sculescu, V. M., Tuhu?, L. I., & Matei, A. D. (2023). Analysis of the risks generated by hydrogen filling stations for green mobility. International Multidisciplinary Scientific GeoConference Surveying Geology and Mining Ecology Management, SGEM, 23(4.1). https://doi.org/10.5593/sgem2023/4.1/s17.03

Dauda, S., Billa, G., & Sobie, A. (2022). Assessing the adequacy of the emergency assembly points in fuel filling stations in Ghana: The perspective of the public. The International Journal of Humanities & Social Studies, 10(5). https://doi.org/10.24940/theijhss/2022/v10/i5/hs2205-019

Fachrurrazi, D., Anwar, C., & Hasan, A. (2017). Rencana anggaran biaya dan metode pelaksanaan pada proyek pembangunan Jembatan Lamnyong Kota Banda Aceh. Jurnal Sipil Sains Terapan, 1(1).

Hidayat, A., & Santosa, E. (2021). Study on the feasibility of petrol station development in the Indonesian border area. Journal of Economic Development, 9(1), 123–138.

Husnita, Jufriza, Faisal, M., Iqbal, Jufandi, Fithra, H., & Maizuar. (2023). Calculation of cost budget plan and development of implementation method on preservation of Aceh Selatan/Subulussalam boundary road - Sumut Province boundaries. Proceedings of Malikussaleh International Conference on Multidisciplinary Studies (MICoMS), 3. https://doi.org/10.29103/micoms.v3i.226

Kusnadi, R., & Sumarno, H. (2020). Feasibility analysis of petrol stations in remote areas with payback period model. Journal of Regional Development, 5(2), 89–103.

Maskur, A. (2023). Analisis perbandingan biaya rencana pelaksanaan antara upah harian dan borongan terhadap rencana anggaran biaya. Jurnal Media Teknologi, 9(2). https://doi.org/10.25157/jmt.v9i2.2947

Pertamina. (2023). Petrol station operational policy and technical guidelines in the Sumatra region. PT Pertamina (Persero).

Tahan, T. (2021). Perbandingan rencana anggaran biaya antara metode SNI 2010 dan analisis harga satuan pekerjaan. Jurnal Kacapuri: Jurnal Keilmuan Teknik Sipil, 4(2). https://doi.org/10.31602/jk.v4i2.6443

Downloads

Published

2025-09-11

How to Cite

Joharudin, J., Al Rosyid, W. M. ., Purnama, O. ., & Purnomo, S. E. . (2025). Feasibility Analysis of Station Construction Project Public Refueling (Petrol Station). Journal of World Science, 4(9), 1186–1196. https://doi.org/10.58344/jws.v4i9.1482