Strategy to Improve the Accuracy of Dewatering Pit Pumping Forecasts by Designing an IoT-Based Realtime Pump Discharge Monitoring System (SIMPATIK) in the Mining Environment of PT Antareja Mahada Makmur (AMM) Jobsite Mifa Bersaudara (2026)
DOI:
https://doi.org/10.58344/jws.v5i10.1710Keywords:
Ultrasonic Flowmeter, Internet of Things (IoT), Discharge Pump, Mine Dewatering, Real-Time MonitoringAbstract
Accurate dewatering forecasts are essential for maintaining production schedules and safe working conditions in open-pit coal mines. At the Mifa Bersaudara jobsite of PT Antareja Mahada Makmur (AMM), weekly manual pump discharge measurements limited the detection of pumping fluctuations, resulting in a dewatering forecast accuracy of approximately 50%. This study aimed to improve dewatering forecast accuracy through SIMPATIK, an Internet of Things (IoT)-based real-time pump discharge monitoring system. An operational improvement approach based on the Plan–Do–Check–Act (PDCA) cycle was implemented from August 2025 to March 2026. The system integrated clamp-on ultrasonic flow sensors, a microcontroller, a data logger, and an online monitoring dashboard to record pump discharge at three-second intervals. Hydraulic calculations were used to determine the optimal pump discharge range, while system performance was evaluated by comparing forecast and actual water-level reductions before and after implementation. The results showed that dewatering forecast accuracy increased from approximately 50% to more than 95%, while equipment assembly costs decreased from IDR 138,236,000 to IDR 16,280,000, representing a cost reduction of approximately 88%. Improved discharge monitoring supported the scheduled exposure of 206,733 metric tons of Seam C coal and was associated with an increase in overburden production from 689,400 to 879,400 bank cubic meters (BCM). Remote monitoring also reduced the need for manual discharge measurements near water bodies. These findings indicate that integrating continuous pump discharge monitoring into mine dewatering planning can improve forecast reliability, support production coordination, reduce monitoring costs, and minimize personnel exposure to operational hazards.
References
Anapah, D. C., Banunaek, N., Metboki, M., & Ahmad, A. (2024). Technical planning of mine dewatering in the sump of Tempudo Pit 4 of PT Kalimantan Prima Persada at PT Indexim Coalindo, East Kutai Regency, East Kalimantan Province. Journal of Mineral Technology, Mulawarman University.
Aryanda, D., Ramli, M., & Djamaluddin, H. (2014). Coal mining sequence design to meet monthly production targets (Case study: Bara 14 Seam C PT Fajar Bumi Sakti, East Kalimantan). GEOSCIENCE Journal, 10(2), 74–79.
Cuya-Acuña, E. M., Villanueva-Salazar, M. B., Arauzo-Gallardo, L. A., & Raymundo, C. (2025). Prevention of accidents by rockfall applying the Deming cycle methodology in an iron oxide copper gold deposit. In Proceedings of the LACCEI International Multi-Conference for Engineering, Education and Technology (LACCEI 2025). https://doi.org/10.18687/LACCEI2025.1.1.1539
Das T. H., A., Surendran, D. T., P U, A. K., Wilson, A., Krishnankutty, S. V., & Roy, A. (2025). IoT based real-time measuring and monitoring system for irrigation canals. Journal of Applied Science, Engineering, Technology and Management, 3(2), 7–14. https://doi.org/10.61779/jasetm.v3i2.2
Dixon, S. M., Greenshields, D., Li, Z., Burton, R., Burton, T., & Smith, L. D. (2023). High accuracy, low cost ultrasonic clamp-on flow metering of small diameter, thin walled pipe. In Proceedings of the 19th International Flow Measurement Conference (FLOMEKO 2022) (pp. 1–4). IMEKO. https://doi.org/10.21014/tc9-2022.051
Endress+Hauser. (n.d.). Working principle of transit-time type ultrasonic flowmeter measurement [Technical documentation].
Fernandes, R. da S., Sousa, J. C. da C., & Luz, R. M. do N. (2022). Integrated management analysis of production performance, maintenance, and PDCA cycle: A case study of the IPCC mining process. Revista Produção Online, 22(2), 2731–2762. https://doi.org/10.14488/1676-1901.v22i2.4661
Grzelak, S., Czoków, J., Kowalski, M., & Zieli?ski, M. (2014). Ultrasonic flow measurement with high resolution. Metrology and Measurement Systems, 21(2), 305–316. https://doi.org/10.2478/mms-2014-0026
Halim, A., Mangkona, & Rizqi, S. R. V. (2022). Optimalisasi kinerja pompa centrifugal Multiflo MF 420EX in open pit mines. Jurnal Geomine, 10(1), 80–88. https://doi.org/10.33536/jg.v10i01.1516
More, K. S., Wolkersdorfer, C., Kang, N., & Elmaghraby, A. S. (2020). Automated measurement systems in mine water management and mine workings – A review of potential methods. Water Resources and Industry, 24, Article 100136. https://doi.org/10.1016/j.wri.2020.100136
Nauli, F., Irfan, A., Yanti, S. R., Alghifari, A., & Deny, A. V. (2024). Analysis of pump requirements for mine dewatering sump at Kerinci PT Cipta Kridatama jobsite PT Kuansing Inti Makmur. Motivection, 6(3).
Nguyen, V., Chau, C. K. B., & Tran, T. (2023). PDCA from theory to effective applications: A case study of design for reducing human error in assembly process. Advances in Operations Research, 2023, Article 8007474. https://doi.org/10.1155/2023/8007474
Nugroho, W., Arifianto, M. J. F., Afianto, A., Wicaksono, A., & Nursim, N. (2025). Web based IoT monitoring system for ultrasonic water flow measurement using ESP32-S3 and cloud database. Journal of Soft Computing Exploration, 6(4).
Prabawa, K. D., Haeruddin, H., & Aminah, S. (2026). Rancangan teknis sistem penyaliran tambang tanah liat di Pit Tlogowaru V PT Semen Indonesia (Persero) Tbk Site Tuban. Jurnal Teknologi Mineral FT UNMUL, 14(1), 67–76. https://doi.org/10.30872/jtm.v14i1.20640
Prabowo, H., Wahyudi, W., & Rolitu, R. (2023). Distribution system dewatering in coal mining at PIT Sena Sungai Lilin District, Musi Banyuasin Regency, South Sumatra Province. Jurnal Pendidikan Teknologi Kejuruan, 6(2), 70–79. https://doi.org/10.24036/jptk.v6i2.32623
Sadi, S., & Mulyati, S. (2026). IoT-based water level monitoring and automatic floodgate control using Arduino with cloud integration. Journal of Electrical Engineering and Computer (JEECOM), 8(2). https://doi.org/10.33650/jeecom.v8i2.17102
Sari, A. S., Cahyono, Y. D. G., & Kombongkila, Y. (2023). Technical design of wells (sump) and pump requirements in open pit mine drainage at PT. Mulia Baratama Plan, Long Beleh, Kembang Janggut, Kutai Kartanegara, East Kalimantan. Journal of Applied Sciences, Management and Engineering Technology, 4(2), 73–80. https://doi.org/10.31284/j.jasmet.2023.v4i2.5031
Ton, V. (2022). Industrial experiences show clamp-on ultrasonic transit time flow meters assumptions lead to erroneous measurement results. Results in Engineering, 15, Article 100496.
Vlachos, M., Pavlopoulos, L., Georgakopoulos, A., Tsimiklis, G., & Amditis, A. (2024). A robust end-to-end IoT system for supporting workers in mining industries. Sensors, 24(11), Article 3317. https://doi.org/10.3390/s24113317
Worldsensing. (2024). Monitoring water level, dewatering and pumping stations for an open-pit gold mine in Nevada, USA [Case study report].
Zhang, H., Li, B., Karimi, M., Saydam, S., & Hassan, M. (2023). Recent advancements in IoT implementation for environmental, safety, and production monitoring in underground mines. IEEE Internet of Things Journal, 10(16), 14507–14526. https://doi.org/10.1109/JIOT.2023.3267828
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Felix Suranta Sihotang, Garata Gema Putra Tarigan, Brillian Candra, Widodo Cahyono Putro, Agus Widiyanto

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International. that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work.