MADE BAYU ANGGARA, I.; DARMA, Y. .; MUBARAK, M. Analysis of Return on Investment Associated with Changes in Operational Time in the Construction of the Sigli-Banda Aceh Toll Road. Journal of World Science, [S. l.], v. 2, n. 2, p. 172–181, 2023. DOI: 10.58344/jws.v2i2.222. Disponível em: https://jws.rivierapublishing.id/index.php/jws/article/view/222. Acesso em: 22 aug. 2026.