Rendra, Taufik, Feriyanto v, Farhan Al Khaebar, and Tira Roesdiana. “Comparative Analysis of Material Take-Off Structure (North Building) B.Ut.2 UT.75 Based on BIM (Building Information Modeling) Between Autodesk Revit and Manual Quantity Calculation in LMS-02 Range Irrigation Project”. Journal of World Science 4, no. 5 (June 10, 2025): 601–611. Accessed August 28, 2026. https://jws.rivierapublishing.id/index.php/jws/article/view/1444.