1.
Firdaus MR, Hilmistsani MN, Rosyad AS. A Comparative Study of Top-Down and Cut-and-Cover Methods in Tunnel Construction. JWS [Internet]. 2026Aug.26 [cited 2026Aug.26];5(8):811-8. Available from: https://jws.rivierapublishing.id/index.php/jws/article/view/1695