Analysis of Train Travel Patterns Case Study of Bogor Double Track Construction - Sukabumi

Authors

  • Ahmad Ependi Politeknik Perkeretaapian Indonesia Madiun
  • Erifendi Churniawan Politeknik Perkeretaapian Indonesia Madiun

DOI:

https://doi.org/10.58344/jws.v2i1.128

Keywords:

stations, trains, development

Abstract

In this study the aim is to analyze the problem of train travel that occurs with the change from single track to double track as well as changes in the layout of the emplacements, which increase the frequency of passenger and freight train trips. The data used in this study are primary and secondary. Primary data includes existing data on the Bogor-Sukabumi operation pattern obtained by interviewing West Java BTP and KAI employees. Secondary data includes data on train star formation, the type and number of trains, signal service time, and the speed of passenger and freight trains. In the planning of road plots in the Detailed Design of Double Tracks Between Bogor - Cigombong, it is not directly affected by traffic capacity. This is because road plots can be divided into several block plots, which is very different from the single-lane system. To reduce Headway or the same as to increase traffic capacity, simply by adding IB (Intermediate Block) between the distances of AB stations (AB (km) S) in the formula, if 1 (one) IB is installed, then the distance of the road plot is divided by two, if 2 (two) IBs are installed, then the distance of the road plot is divided by three and so on. The analysis  study of operational patterns on the Bogor-Sukabumi line shows that with the plan to increase the frequency of trains and the construction of a double track, there will be a decrease in the Headway from 10.38 to 7.1.

References

Alfeno, S., & Devi, R. E. C. (2017). Implementasi Global Positioning System (GPS) dan Location Based Service (LSB) pada Sistem Informasi Kereta Api untuk Wilayah Jabodetabe. Jurnal Sisfotek Global, 7(2). http://dx.doi.org/10.38101/sisfotek.v7i2.146

Aminah, S. (2018). Transportasi Publik dan Aksesbilitas Masyarakat Perkotaan. Jurnal Teknik Sipil, 9(1), 1142–1155. Aminah, S. (2018). Transportasi Publik dan Aksesbilitas Masyarakat Perkotaan. Jurnal Teknik Sipil, 9(1), 1142–1155.

Chandra, A., & Munthe, A. G. (2012). Profil Kesiapan Daerah Dalam Memasuki Masyarakat Ekonomi ASEAN Studi kasus: Sektor Kepariwisataan Jawa Barat 2012 (Studi Kasus: di Bandung, Cianjur dan Sukabumi). Research Report-Humanities and Social Science, 1.

Fajar Ramadhan, F. R. (2021). Kajian Penggunaan Bantalan Kayu Dan Bantalan Sintetis Pada Jembatan Di Lintas Kiaracondong–Cicalengka. Politeknik Transportasi Darat Indonesia-STTD.

Farhan Syahfarul Maghribi, F. S. (2022). Engintegrasian Pola Operasi Perjalanan Kereta Api Pangrango Dan Siliwangi Di Stasiun Sukabumi. Politeknik Transportasi Darat Indonesia-STTD.

Hanif, M., Moetriono, H., & Mudjanarko, S. W. (2020). Analisis Pola Operasi Kereta Api Di Stasiun Surabaya Gubeng. E-Jurnal Spirit Pro Patria, 6(1), 1–15. https://doi.org/10.29138/spirit%20pro%20patria.v6i1.1091

Hidayat, Y. P. (2019). Tinjauan Yuridis Terhadap Pengguna Jasa Kereta Api Yang Mengalami Kerugian Dalam Menggunakan Jasa Pengangkutan Kereta Api (PT. Kereta Api Indonesia) Di Kota Medan. Universitas Dharmawangsa.

Kulon, K. M., & Barat, K. M. K. M. J. (2017). Metodologi penelitian.

Muhamad Hafiz Azdam, H., Suharto, S., & Rachmat Sadili, R. (2022). Risiko Keselamatan Di Perlintasan Sebidang Jpl 10 Km 4+ 366 Petak Jalan Bogor Paledang–Batutulis. Politeknik Transportasi Darat Indonesia-STTD.

Nurfadhila, A. M., Surahmat, H., & Anggrawati, E. A. (2020). Perpanjangan Lintas dan Rencana Pola Operasi Kereta Api Lembah Anai Wilayah Divre II Sumatera Barat. Prosiding Forum Studi Transportasi Antar Perguruan Tinggi, 846.

Perhubungan, K. (2011). Ditjen Perkeretaapian. Jakarta.

Perkeretaapian, D. J. (2021). No Title. Djka.Dephub.Go.Id. https://djka.dephub.go.id/tinjau-progres-jalur-ganda-kereta-api-bogor-sukabumi-menhub-tahap-1-bogor-cigombong-ditargetkan-selesai-maret-2022

Sandy, T. A., & Leliana, A. (2021). Evaluasi Performansi Kognitif Petugas Perjalanan Ka Terhadap Lintas Double Track Madiun-Jombang Daop VII Madiun. Prosiding Forum Studi Transportasi Antar Perguruan Tinggi, 580.

Siregar, A. M., Kustiani, I., Widyawati, R., & Purba, A. (2020). Analisis pola perjalanan kereta api studi kasus pengembangan jalur ganda Gedebage-Cicalengka. Prosiding Seminar Nasional Ilmu Teknik Dan Aplikasi Industri Fakultas Teknik Universitas Lampung, 3.

Yudhanto, F. (2021). Evaluasi kesesuaian antara dokumen perencanaan dengan peraturan perundang-undangan dalam kegiatan pengadaan tanah di bendungan karian kabupaten lebak. Sekolah Tinggi Pertanahan Nasional.

Downloads

Published

2023-01-14

How to Cite

Ependi, A., & Churniawan, E. (2023). Analysis of Train Travel Patterns Case Study of Bogor Double Track Construction - Sukabumi . Journal of World Science, 2(1), 52–66. https://doi.org/10.58344/jws.v2i1.128